Past UK Projects
Project: Package-Substation
Desctiption: The Design, Manufacture, Installation & Testing of a 1500kVA Package Sub-Station.
Click here to download more information on this project.
Project: Transformer & Switchboard Installation
Desctiption: The Design, Installation & Testing of a 11kV/433V, 1500kVA Supply.
Project: Chemical Treatment Control Panel
Desctiption: The Design, Manufacture, Installation & Testing of a Control System for a Liquid Waste Treatment Plant.